Interface: NMDOT District 1 TOC and NMDOT Lane Controls
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
NMDOT District 1 TOC | traffic metering control (P) | NMDOT Lane Controls |
NMDOT Lane Controls | traffic metering status (P) | NMDOT District 1 TOC |