Mass.gov  
Office Of Transporation Planning Massachusetts DOT Office of Transportation Planning
Commonwealth of Massachusetts Regional ITS Architectures Commonwealth of Massachusetts Regional ITS Architectures Commonwealth of Massachusetts Regional ITS Architectures

MCV Roadway Maintenance and Construction


Equipment Package: MCV Roadway Maintenance and Construction

Description: This equipment package includes the on-board systems that support routine non-winter maintenance on a roadway system or right-of-way. Routine maintenance includes landscape maintenance, hazard removal (roadway debris, dead animals), routine maintenance activities (roadway cleaning, grass cutting), and repair and maintenance of both ITS and non-ITS equipment on the roadway (e.g., signs, traffic controllers, traffic detectors, dynamic message signs, traffic signals, etc.).
Included In: City of New Bedford Maintenance Vehicles
Local City/Town DPW Maintenance and Construction Vehicles
MassDOT - Highway Division Maintenance and Construction Vehicles
Town of Barnstable Maintenance Vehicles
Town of Plymouth Maintenance Vehicles
Functional Requirements 1 - The maintenance and construction vehicle shall track the location and status of safety systems on-board the vehicle.
2 - The maintenance and construction vehicle shall respond to control information from the center to allow remote operation of the on-board vehicle systems. These systems include routine maintenance equipment for cutting, repairs, hazard removal, etc.
3 - The maintenance and construction vehicle shall monitor materials information including remaining quantity and current application rate of materials on the vehicle.
4 - The maintenance and construction vehicle shall respond to dispatch information from the center, presented to the vehicle operator for acknowledgement and returning status.
5 - The maintenance and construction vehicle shall send operational data to the center including the operational state of the maintenance equipment (e.g., blade up/down, spreader pattern), types and quantities of materials used for construction and maintenance activities, and a record of the actual work performed.
 Region Home Page
 Stakeholders
 Inventory by Stakeholder
 Inventory by Entity
 Market Packages by Functional Area
 Market Packages by Stakeholder
 Market Package Descriptions
 Equipment Package Descriptions
 Architecture Flow Descriptions
 Project Documents
 Regional Projects
 Standards
Home | About Us | Employment | Contact Us | Site Policies Copyright © 2013 Commonwealth of Massachusetts