|
Responsible Agency: MassDOT - Highway Division
Project Title: Signal Preemption at Rail Crossings |
| Project Description: |
This project would install signal preemption at pre-signals at road intersections near rail crossings on Kings Highway at Church Street and the Route 140 on/off ramps. The goal of this signal preemption is to prevent the queuing of traffic on railroad crossings, which would prevent rail-auto conflicts and collisions. |
| Stage: |
Planned |
| Project Location: |
Kings Highway |
| Project Type: |
Signal Preemption |
| Relevant ITS Strategic Plan Goal(s): |
Coordination; Safety and Security |
| Cost: |
|
| TIP ID: |
|
| Reference: |
Southeastern Massachusetts MPO 2012 Long Range Plan |
| Referenced Service Packages from Regional ITS Architecture: |
|