ADOT Ramp Meters and ADOT FMS
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Send Your Comments
Source
Architecture Flows
Destination
ADOT Ramp Meters
traffic metering status (E)
ADOT FMS
ADOT FMS
traffic metering control (E)
ADOT Ramp Meters
Last updated: 06-23-13