ADOT Ramp Meters and ADOT FMS

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned

Send Your Comments
SourceArchitecture FlowsDestination
ADOT Ramp Meters traffic metering status (E)

ADOT FMS
ADOT FMS traffic metering control (E)

ADOT Ramp Meters

Last updated: 06-23-13