Interface: RoadRUNNER Transit Kiosks and NMDOT NMRoads
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
RoadRUNNER Transit Kiosks | traveler request (P) | NMDOT NMRoads |
NMDOT NMRoads | interactive traveler information (P) | RoadRUNNER Transit Kiosks |