Interface: NMDOT CCTV and NMDOT Statewide TMC
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
NMDOT CCTV | field device status_ud (P) traffic images (E) | NMDOT Statewide TMC |
NMDOT Statewide TMC | video surveillance control (E) | NMDOT CCTV |