Interface: NMDOT CCTV and NMDOT District 1 TOC
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
NMDOT CCTV | traffic images (E) | NMDOT District 1 TOC |
NMDOT District 1 TOC | video surveillance control (E) | NMDOT CCTV |