Farmington ITS Architecture Update
Interface: Bloomfield Field Devices and Farmington Traffic Operations Center
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Send Your Comments
Source
Architecture Flows
Destination
Bloomfield Field Devices
traffic images (P)
traffic flow (P)
signal fault data (P)
signal control status (P)
right-of-way request notification (P)
Farmington Traffic Operations Center
Farmington Traffic Operations Center
video surveillance control (P)
traffic sensor control (P)
signal system configuration (P)
signal control plans (P)
signal control device configuration (P)
signal control commands (P)
Bloomfield Field Devices
Last updated: 06-30-15