Farmington ITS Architecture Update
Interface: Bloomfield Field Devices and Bloomfield Traffic Management
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Send Your Comments
Source
Architecture Flows
Destination
Bloomfield Field Devices
roadway information system status (P)
field device status (P)
field device status_ud (P)
signal fault data (P)
signal control status (P)
right-of-way request notification (P)
traffic images (P)
traffic flow (P)
Bloomfield Traffic Management
Bloomfield Traffic Management
roadway information system data (P)
flasher control_ud (P)
signal system configuration (P)
signal control plans (P)
signal control device configuration (P)
signal control commands (P)
video surveillance control (P)
traffic sensor control (P)
Bloomfield Field Devices
Last updated: 06-30-15