Farmington ITS Architecture Update
Interface: Farmington Streets Vehicles and Farmington Streets Maintenance Yard
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Send Your Comments
Source
Architecture Flows
Destination
Farmington Streets Vehicles
work zone status (P)
maint and constr vehicle operational data (P)
maint and constr dispatch status (P)
maint and constr vehicle conditions (P)
maint and constr vehicle location data (P)
Farmington Streets Maintenance Yard
Farmington Streets Maintenance Yard
maint and constr vehicle system control (P)
maint and constr dispatch information (P)
Farmington Streets Vehicles
Last updated: 06-30-15