Interface: DDOT Traffic Signals and Other DDOT Traffic Devices
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
DDOT Traffic Signals | roadway equipment coordination (P) | Other DDOT Traffic Devices |
Other DDOT Traffic Devices | roadway equipment coordination (P) | DDOT Traffic Signals |