Interface: DDOT Salt Domes and DDOT Snow Operations
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
DDOT Salt Domes | maintenance materials storage status (P) | DDOT Snow Operations |
DDOT Snow Operations | storage facility request (P) | DDOT Salt Domes |