Interface: DDOT TMC and DDOT Snow Operations
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
DDOT TMC | DDOT Snow Operations | |
DDOT Snow Operations | roadway maintenance status (P) | DDOT TMC |