Interface: DDOT TMC and DDOT Anti-icing Equipment
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
DDOT TMC | roadway treatment system control (P) | DDOT Anti-icing Equipment |
DDOT Anti-icing Equipment | field device status (P) roadway treatment system status (P) | DDOT TMC |