Interface: DDOT TMC and DDOT Drawbridge Control System
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
DDOT TMC | DDOT Drawbridge Control System | |
DDOT Drawbridge Control System | multimodal crossing status (P) | DDOT TMC |