Interface: DDOT TMC and CHEMTREC
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
DDOT TMC | hazmat information request (P) | CHEMTREC |
CHEMTREC | hazmat information (P) | DDOT TMC |