Interface: DDOT PTSA and DC Circulator Website
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
DDOT PTSA | transit schedule adherence information (E) transit probe data (E) | DC Circulator Website |
DC Circulator Website | DDOT PTSA |