Interface: MWCOG TPB Database and DDOT PTSA
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
MWCOG TPB Database | archive coordination (P) | DDOT PTSA |
DDOT PTSA | archive coordination (P) | MWCOG TPB Database |