West Memphis Regional ITS Architecture


Menu
Region Home
Stakeholders
ITS Inventory
Inventory by Stakeholder
Inventory by Entity
Sausage Diagram
Market Packages by Functional Area
Market Packages by Stakeholder
Market Package Descriptions
Equipment Package Descriptions
Architecture Flow Descriptions
Project Documents
Send Your Comments

 

 

 

Equipment Package: Transit Center Paratransit Operations

Description: This equipment package provides the capability to automate planning and scheduling, allowing paratransit and flexible-route transit services to develop, print and disseminate schedules, and automatically update customer service operator systems with the most current schedule. In addition, this equipment package provides the capability to assign vehicle operators to routes in a fair manner while minimizing labor and overtime services, including operator preferences and qualifications, and automatically tracking and validating the number of work hours performed by each individual operator. These capabilities shall be provided through the utilization of dispatch and fleet management software running on a workstation type processor.
Included In: MATA Transit Management Center
Functional Requirements 1 - The center shall process trip requests for demand responsive transit services, i.e. paratransit. Sources of the requests may include traveler information service providers.
2 - The center shall monitor the operational status of the demand response vehicles including status of passenger pick-up and drop-off.
3 - The center shall generate demand response transit (including paratransit) routes and schedules based on such factors as parameters input by the system operator, what other demand responsive transit schedules have been planned, the availability and location of vehicles, the relevance of any fixed transit routes and schedules, and road network information.
4 - The center shall dispatch demand response (paratransit) transit vehicles.
5 - The center shall exchange information with Maintenance and Construction Operations concerning work zones, roadway conditions, asset restrictions, work plans, etc.
6 - The center shall disseminate up-to-date schedules and route information to other centers for demand responsive transit services (paratransit).

Last updated: 03-08-06