Description: | Positive Train Control equipment on Rail Runner trains. |
Status: | Planned |
Stakeholder: | Rio Metro Regional Transit District |
Functional Areas: (Linked to Functional Requirements) |
View All Functional Requirements On-board Transit Trip Monitoring |
Interfaces: (Flows) |
Rail Runner Wayside Equipment Rio Metro Operations Center |
Service Packages: |
APTS01 - Transit Vehicle Tracking - Rail Runner PTC |
Mapping: |
Transit Vehicle |