AMPA Regional ITS Architecture Update
AMPA Home
Stakeholders
Stakeholders
Inventory by Stakeholder
Services by Stakeholder
Projects by Stakeholder
Operational Concepts
Inventory
Inventory
Inventory by Stakeholder
Inventory by Entity
Services
Services
Service Package Descriptions
Services by Stakeholder
Architecture
Architecture Interfaces
Architecture Flow Descriptions
Projects
Projects
Projects by Stakeholder
Resources
How to Use Web Site
Systems Engineering Analysis
Project Documents
ITS Architecture
ITS Standards
Glossary
Feedback
Interconnect: ABQ RIDE Paratransit Dispatch System - ABQ RIDE Paratransit Vehicles
(Click on image to view full-size)
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
ABQ RIDE Paratransit Dispatch System
transit traveler information (E)
request for vehicle measures (P)
secure area surveillance control (P)
alarm acknowledge (E)
transit vehicle operator information (E)
ABQ RIDE Paratransit Vehicles
ABQ RIDE Paratransit Vehicles
transit vehicle conditions (P)
secure area surveillance data (P)
alarm notification (E)
request for bad tag list (P)
fare collection data (P)
demand response passenger and use data (E)
transit vehicle schedule performance (E/P)
transit vehicle location data (E)
ABQ RIDE Paratransit Dispatch System